PROJECT INFORMATION
Project Name
Product Type
Client
Dimensions
Costing Method
Dimension Unit
COSTING SETTINGS
Wastage %
Labor Rate / Hour
Overhead / Product
Target Profit Margin %
Delivery
Installation
CUT-LIST BASED COSTING
Enter each furniture part below. The calculator estimates material
usage from the part dimensions and calculates the required number
of sheets based on the sheet size.
Note: This is an estimated sheet-usage calculation, not a full CNC nesting optimizer. Cutting kerf and actual nesting efficiency can vary depending on the cutting layout.
Note: This is an estimated sheet-usage calculation, not a full CNC nesting optimizer. Cutting kerf and actual nesting efficiency can vary depending on the cutting layout.
Sheets / Materials
Add each sheet or board you use. Every cut-list part can then select one of these sheets or metals, and its cost is calculated from that sheet or metal's own stock dimensions and price.
Add each sheet or board you use. Every cut-list part can then select one of these sheets or metals, and its cost is calculated from that sheet or metal's own stock dimensions and price.
| Sheet / Material | Length mm | Width mm | Sheet Price | Action |
|---|---|---|---|---|
Metals
Add tubulars, rebars, flat bars, angle bars, or other metal stock you use. Every cut-list part can select a metal, and its cost is calculated from that metal's stock length and price.
Add tubulars, rebars, flat bars, angle bars, or other metal stock you use. Every cut-list part can select a metal, and its cost is calculated from that metal's stock length and price.
| Metal / Material | Type | Size | Stock Length mm | Price / Stock Length | Action |
|---|---|---|---|---|---|
| Part | Qty | Length mm | Width mm | Material | Area m² | Sheet Usage | Estimated Cost | Action |
|---|---|---|---|---|---|---|---|---|
| 0.00 | 0.00 | ₱0.00 | ||||||
| 0.00 | 0.00 | ₱0.00 | ||||||
| 0.00 | 0.00 | ₱0.00 |
Pricing rule: sheet parts are calculated by area using the selected sheet size and price. Metal parts are calculated by linear length using the selected metal stock length and price. Metal width is not used for pricing.
Sheet Area
0.00 m²
Sheet Usage
0.00
Sheets to Buy
0
Sheet Material Cost
₱0.00
Metal Length
0.00
Metal Stock Usage
0.00
Metal Stock to Buy
0
Metal Material Cost
₱0.00
Total Cut-List Material Cost
₱0.00
MATERIALS
| Material | Qty | Unit | Unit Cost | Base Cost | Cost + Wastage | Action |
|---|---|---|---|---|---|---|
| ₱0.00 | ₱0.00 | |||||
| ₱0.00 | ₱0.00 | |||||
| ₱0.00 | ₱0.00 | |||||
| ₱0.00 | ₱0.00 | |||||
| ₱0.00 | ₱0.00 | |||||
| ₱0.00 | ₱0.00 | |||||
| ₱0.00 | ₱0.00 | |||||
| TOTAL MATERIALS | ₱0.00 | ₱0.00 | ||||
HARDWARE
| Hardware | Qty | Unit | Unit Cost | Total | Action |
|---|---|---|---|---|---|
| ₱0.00 | |||||
| ₱0.00 | |||||
| ₱0.00 | |||||
| ₱0.00 | |||||
| ₱0.00 | |||||
| ₱0.00 | |||||
| TOTAL HARDWARE | ₱0.00 | ||||
LABOR
| Work | Hours | Rate / Hour | Labor Cost | Action | |
|---|---|---|---|---|---|
| ₱150.00 | ₱0.00 | ||||
| ₱150.00 | ₱0.00 | ||||
| ₱150.00 | ₱0.00 | ||||
| ₱150.00 | ₱0.00 | ||||
| ₱150.00 | ₱0.00 | ||||
| ₱150.00 | ₱0.00 | ||||
| TOTAL LABOR | 0 | ₱0.00 |
PRICING SUMMARY
Materials + Wastage
₱0.00
Hardware
₱0.00
Labor
₱0.00
Shop Overhead
₱0.00
TRUE COST
₱0.00
Delivery
₱0.00
Installation
₱0.00
Cost Before Profit
₱0.00
Target Profit Margin
30%
RECOMMENDED SELLING PRICE
₱0.00
Estimated Gross Profit
₱0.00
NOTES
- Standard Costing uses the Materials table.
- Cut-List Based Costing uses part dimensions and sheet usage.
- Actual supplier prices should be entered.
- Wastage should be adjusted based on the cutting layout.
- Labor rate should reflect actual shop payroll.
- Overhead should include rent, electricity, tools and maintenance.
- Target Profit Margin is calculated on selling price.
- Delivery and installation are added before profit.
FineBuild Costing Calculator — How to Use
- Enter your project information.
- Select Standard Costing or Cut-List Based Costing.
- For Standard Costing, enter material quantities and supplier prices.
- For Cut-List Costing, enter every part's quantity and dimensions, then select the sheet or metal stock used for that part.
- Enter your sheet dimensions and sheet price.
- Use + Add Cut-List Part for additional parts.
- Use + Add Hardware for additional hardware.
- Use + Add Labor for additional work.
- Review TRUE COST.
- Review the RECOMMENDED SELLING PRICE.
- Wastage: 10%
- Labor: ₱150/hour
- Overhead: ₱2,000/project
- Target profit margin: 30%
- Standard sheet: 2440 × 1220 mm
- Cutting allowance: 5%